Title 24 Part 6 is paperwork the jurisdiction expects: CF-1R at permit, then the HERS/ECC measures the inspector will look for. We write that. We do not install the system.
HVAC change-outs, residential, ADUs. Fast turnaround so the set does not sit in a queue. Results on the HERS/ECC side register the same day when CHEERS allows it.
If the energy calcs do not match the plans, call. That is a normal Tuesday.




